Revised plans for the proposed Thirroul Plaza deveopment have been lodged with Wollongong Council.

The main points are:

Break between building D and E increased

Residential parking decreased from 123 to 77

Relocation of residential visitor spaces closer to the common residential lift

Retail parking increased from 198 to 206

Residential lobby from LHD increased in width and brought forward closer to the front boundary

Break in building increased to 14m and shop 6 set back to allow for greater area for outdoor seating

Retail floor levels lifted to comply with flood levels

Shops 1-5 setback further from the front boundary to provide a minimum 4.5m wide footpath

Break between building D & E increased to 14m.

Concierge and mailroom added off King St entrance

Apartments E-201 and E-202 combined in to one 3 bed unit

Window and balcony treatment further refined with greater vertical proportions to openings

The revisions can be accessed at the following link:

https://epathway.wollongong.nsw.gov.au/epathway/Production/Web/GeneralEnquiry/EnquiryDetailView.aspx?Id=1220609

 

 

Comments powered by CComment

Newsletter

 

 

How to join us..

Contact Murray Jones

Connect with us

We're on Social Networks.
Follow us & get in touch.