Dear Engagement Team

First up the Thirroul Village Committee (TVC) would like to thank Council on the work done on upgrading the Children’s Playground at Thirroul Beach. This asset was in dire need of repair and is once again being well patronised. Also, please accept our thanks for taking steps to protect the Amy Monument. The four sandstone blocks surrounding the monument appear to provide excellent temporary protection.

The TVC has reviewed the Draft Infrastructure Delivery Program 2023-2024 to 2026-2027 and would like to make two comments on the overall process and then on assets located around Thirroul. 

The summary document of infrastructure projects and the interactive on-line map have helped identify local projects. However, limited information about the projects is provided. It would be more useful if a description of the work and associated costing was included in the description and on the interactive map. This would not only be useful but would save time for all concerned. 

We are aware that costings may not always be feasible, especially if the work has been put out to tender. However, an approximate figure may be possible – e.g., above, or below $5,000; above or below $10,000; above or below $50,000 etc. By doing this the TVC and other local committees could concentrate on high value projects.

Proposed Skate Park for Thirroul

The construction of a Skate Park in Thirroul remains on the list. The question remains where will this be located? The skate park will need a sizable space for construction and the TVC is concerned that no such available land exists. Wherever the skate park is located it would need to be in a highly visible position to reduce the incidence of anti-social behaviour. In addition, it would need to be located away from neighbouring residents and places of worship to reduce noise disturbances and complaints. Jackson Park was suggested some time ago, but given its proximity to the Catholic Church and the plans for housing on the neighbouring Thirroul Plaza site to make it more commercially viable, Jackson Park may no longer be possible. In addition, this is the only green space in the main part of Thirroul and has a number of well-established trees on the site. Jackson Park also has a significant slope which would be a disadvantage for a flat skate park bowl.

Given the lack of suitable sites in Thirroul perhaps Bulli would be a better location for a northern suburbs skate park.

Pedestrian Crossing Phillip Street near Ryan’s Hotel

The TVC understands the need to improve pedestrian safety at the crossing near the Ryan’s Hotel. However, the TVC remains concerned about the impact the proposed changes will have on traffic flows along Phillip Street and the side streets adjoining Phillip Street. It is already difficult to join Phillip Street from the side streets, especially during school drop off and pick up times. The changes as proposed will certainly increase this level of difficulty and add to the irritation of drivers.

At present those turning left or north at the intersection of Phillip St and Lawrence Hargrave Drive (LHD) can pass on the inside of those turning south. The changes, as proposed will mean this will no longer be possible. This will result in longer queues along Phillip Street, thus increasing frustration of drivers. A result of this is that a number of locals will resort to driving along the western side streets in order to join LHD. This is certainly not a desirable outcome.

A major issue is that pedestrian use of the crossings at the lights can significantly reduce the amount of time available for vehicles to exit Phillip Street. In the worst-case scenario, only 2 to 3 cars manage to escape every traffic light cycle. This has been an issue for a long time and getting worse since more dual occupancies have been approved in this part of Thirroul. Prior to commencement of work, it would be worthwhile if Council had discussions with Transport for NSW about the installation of a queue detector and conduct a review traffic light sequencing as a means to allow more cars to exit Phillip Street in both directions at any time. This would help prevent traffic queues, avoid frustration and complaints.

Road work at The Esplanade

Whenever heavy rains occur The Esplanade floods. The view is that more than renewal of the road is needed at The Esplanade. Better drainage is needed in the centre of Thirroul, down Bath Street, and along The Esplanade. Would it not be better to use the funds allocated for this project towards much needed improved stormwater drainage? 

Thirroul Library Study Room

We are not sure what is being proposed. Where is it to be located? Is this a new addition to the centre or is it a new room in the library area, or in the Community Centre? How big is it? This is where a description of the work to be conducted would be useful.

Thomas Gibson Park Rugby League Amenities Refurbishment

The TVC asks that refurbishment of the Thomas Gibson Grandstand include repair to the coping of the at the north western entrance to the park and along the blockwork that supports the fence which run alongside the commuter carpark.

In addition to the projects listed in the Draft Infrastructure Delivery Program there are a number of potential projects that were identified by TVC members at our last general meeting on 23 July that could be considered by Council. These include the following: 

Work at Thomas Gibson Park

The north eastern corner entrance to Thomas Gibson Park is in dire need of repair. There is a depression which is continually water filled, making access to the park difficult. The TVC asks that this be included in future Infrastructure Delivery Programs as the area needs to be drained and remediation work conducted.

Amy Monument, playground and promenade at Thirroul Beach

The TVC understands that this monument has been slated for relocation for some time.  We ask that Council work with the community to determine the best location and arrange relocation as a matter of priority. Given the current exposure to damage and the increasing number of visitors to Thirroul Beach from Sydney a better place to display this highly visible and important monument is well warranted. 

Is it possible for garden maintenance to be conducted in the playground area? This well utilised playground is very overgrown and untidy and requires attention.  

With the expected increase in visitors from western Sydney due to the very large housing developments proposed at both Appin and the new airport precinct, the park areas near the beach are in need of attention, especially at the southern end of Thirroul Beach. This park area is in need of a new picnic pavilion and shade trees. It is increasingly well patronised with access to the only picnic shelter being competitive, especially during public holidays and school holiday seasons. 

Once again, with the increasing patronage of Thirroul Beach more seats and more comfortable seats are needed along the beach promenade. Perhaps wooden seats rather than the hot metal currently in use would be better. Added to this more lighting is needed along the length of the beach promenade.

The pavement on promenade on Thirroul Beach is subsiding in parts and will need attention shortly.  The main concern is the danger that this uneven pavement could present.  The promenade is now 83 years old but appears to be well built with the vertical wall components facing the sea appearing to be built on solid rock well below the sand line. This structure and the building process used is revealed in a large photo from that time hanging above the fireplace in the Bulli Railway Station Museum. Any improvement in the Beach area will certainly benefit locals and help increase visitation rates. 

Road maintenance at Church Street, Thirroul

Road maintenance on Church St near the Railway Barracks is urgently needed.  The road has contorted due to constant heavy traffic, such as railway trucks, dump trucks and concrete mixers leading to small vehicles bottoming out. 

Construction of a toilet between Thirroul Beach and McCauley Beach

The TVC received an email from a gentleman with a serious health issue suggesting that a toilet be constructed around McCauley Beach as there are none between Thirroul Beach and Sandon Point. This presents limitations for people with medical issues where walking is part of the recovery. Perhaps investigation into the construction of a toilet near between Thirroul and McCauley’s Beach could be included in the next Infrastructure Delivery Program. The TVC has sent a separate email on this matter to Councillor Cameron Walters.

Footbridge across Flannagan’s Creek near Thirroul Beach

Although not listed there is a real need for a foot/cycle bridge across Flannagan’s Creek at the northern end of Thirroul Beach. Given the increasing visitation to the area this is becoming an issue. For those parking at the northern end of the beach access to amenities in the Thirroul Pavilion means a lengthy walk or drive to these facilities. If a bridge were present access would be easy and faster. 

It would also be good if Council could investigate the possibility of uncovering the old promenade along the northern side of Thirroul Beach to Flannegan’s Creek.  This was built in 1940 and deliberately covered by Council around 1970.

Upgrade of carpark near Woodward Memorial Park and car parking on King Street

The carpark near Woodward Memorial Park is in urgent need of repair. The TVC understands that this land falls under the jurisdiction of the State Government. Perhaps Wollongong City Council could work with the local Member for Heathcote, Ms Maryanne Stuart to have this work organised and completed.

An upgrade of car parking west end of King Street along the railway to Redman Ave Thirroul is needed. This parking needs to be 90 degrees to the street very similar to what has recently been done for the car park at McCauley’s beach east end of Corbet Ave.

The TVC trusts that Wollongong City Council will consider the above suggestions when assessing the Draft Infrastructure Delivery Program for 2023-2027 and when preparing future Infrastructure Delivery Programs. The TVC is happy to engage with Council about these projects.

Yours sincerely

Ray Smith

TVC President 